Delivery is where planning becomes physical. The unit needs a clear path, a prepared location, and a connection plan for utilities.
What must be ready
- Truck access.
- Placement area.
- Foundation or pad.
- Drainage and grading.
- Utility connections.
Common problems
Tight access, unprepared pads, overhead obstacles, and utilities that were treated as a future problem. Future problems love showing up on delivery day.